Watertown High School, Watertown, MA

Watertown High School, Watertown, MA

WatertownHS

Watertown High School, Watertown, MA

  • Architect: Ai3 Architects LLC
  • Owner’s Project Manager: The Vertex Companies, LLC
  • Abatement and Demolition of the Existing 240,000+/- SF High School to allow for  Construction of a new 259,000+/- SF four-story, High School building located on the same site.  The Scope includes the construction of a parking garage within the building footprint, accessible on the ground floor, over which the academic space is constructed. Construction duration is approximately 32 months, in one phase. The scope also includes coordination with existing/new site utilities; existing utilities servicing abutting properties must be maintained during construction.
SHARE IT:

Comments are closed.